Product Detail :
|
Design and build all components of the drinking water supply system including water treatment plant with tapping point at village
parowal block fatehgarh churrian district gurdaspur of output capacity of 9 mld, clear water & raw water pumping station along with
pumping machineries, clear water transmission mains up to ohsrs of existing village water works to achieve the required head, installation of bulk water meters, silent generator, transformer, scada/plc, solar power plant etc. for new facility, for providing bulk supply of water to various villages of block fatehgarh churrian and dera baba nanak, district gurdaspur on dbot basis (number of villages 40). Operation and maintenance of the scheme built including all structures & appurtenances constructed installed pipelines laid for the supply of treated surface water at required pressure, quality and quantity to all the ohsrs in the villages scada etc. for a period of 10 years after commissioning.
|