Product Detail :
|
Construction of the elevated viaduct from end of the ramp at IDPL complex to start of ramp at rajiv chhowk and three nos of elevated station viz, udyog vihar, sector 17 and rajiv chowk (xcluding architectural finishing and pre-engineered steel roof structure of stations) various brts corridor. Shifting / modification of electrical utilities of 33kv, 11kv, lt lines, transformers etc of pvvnl infringing various brts corridor of ncrtc (chainage 54000 to 64500). Shifting / modification of electrical utilities of 33kv, 11kv, lt lines, transformer etc of pvvnl infriging brts corridor (chainage 75700 to 82800). Initial pile load testing from EPE to shatrabdi nagar section of various brts corridor.
|