Product Detail :
|
Supply of horizontal and vertical clamping cylinders for hydraulic system of wagon tipplers in chp-i tps. work contract for servicing, repairing & maintenance of air conditioners and water coolers for (em2) 500 mw tps. servicing of rotork make motorized valve during overhaul of unit-3 of 210 mw tps. work contract for rewinding / restaggering of lt motors and transformers in chp-i on as & when required basis. construction of rcc wall along boundary / border of mspgcl open land area in the jurisdiction of tps. supply of flue gas analyzer & h2 leak detector for unit-5, 500 mw tps. procurement of chlorine gas blower assembly for chlorination plant at tps 210 mw. procurement of fire resistant grade type a2 is 1891 part 5 of 1993 conveyor belt for unit no.1 to 4 cmrh system. work of conducting mandatory energy audit of 4 x
210 mw and 1 x 500 mw unit of tps as per energy conservation act-2001, govt. of india. work of pre-monsoon cleaning roof terrace of auxiliary buildings, providing assistance of jcb for exaction works as & when required in 210 mw unit premises tps. work contract for boiler tube replacement & allied work in 2nd pass by hp welding during aoh of unit-5, 500 mw, tps. work of providing spreading of new 40 mm black metal stones in ht & lt transformer yards of unit- 4 at tps. work of lt transformer overhauling during aoh of unit-4 at 210 mw tps. work of installation of damper sealing plates and repair of damper plates of auxiliary air dampers during aoh at unit-5, 500 mw tps. work contract for maintenance work of id, fd & pa fans during aoh at unit no.-5, tps. replacement of various types of ibr valves by hp welding in unit no.-3aqh. work contract for internal inspection, cleaning, preventive maintenance and painting of 21kv, 11kv & 6.6kv bus duct during aoh of unit-5 (500 mw) tps. annual work contract of cleaning of administrative building & all godowns and open yards at major stores tps. work of non-destructive testing, surprise radiography & radiographic film interpretation of hp joints of boiler pressure part components in unit-3aqh. procurement of various spares for horizontal seal water pumps. work of complete overhauling of tdbfp 5a turbine including insulation work at unit no.-5, 500 mw tps.
|