Product Detail :
|
Construction of 33/11KV Primary Substation with 2x12.5 MVA Transformer including complete Control Room Building and all equipment supply, erection, commissioning, testing and civil works. Construction of 33kV line carrying 148 mm² AAAC overhead line with 13mtr log WPB from DP near Angul 33/11 KV PSS to NALCO Aluminium Park Premises (Side Gate) for route length of 7 km and laying of 33KV 1C x 400mm2 XLPE UG cable. Construction of 33kV line carrying 148mm2 AAAC overhead line with 13mtr long WPB from Chainpal 132/33 kV Grid to NALCO Aluminium Park premises (Front Gate) for route length of 11 km and Supply and laying of 33KV 1C x 400mm2 XLPE UG cable. Construction of 11KV line, 2x500KVA 11/0.4KV Plinth Mounted Substation and LT Line for power supply to upcoming entrepreneur inside proposed Aluminium Park.
|