|
Product Detail :
|
The project involves the supply and installation of 11KV electrical lines, upgrading existing 6.3KV lines to 11KV, and the installation of Distribution Transformer Rectifiers (DTRs) as part of system strengthening efforts. The work will be executed on a partial turnkey basis, with specific materials provided by the Eastern Power Distribution Company. 11KV Lines, DTRs, LT TVR Meters, 55Sq.mm AAAC Conductors
|
| Tender Detail : |
The project involves the supply and installation of 11KV electrical lines, upgrading existing 6.3KV lines to 11KV, and the installation of Distribution Transformer Rectifiers (DTRs) as part of system strengthening efforts. The work will be executed on a partial turnkey basis, with specific materials provided by the Eastern Power Distribution Company. |