Product Detail :
|
Shifting and Re-Installation and Commissioning Existing 500KVA UPS & its accessories from Kumbalagodu to Main Dairy Geijalagere with replacing of batteries On Buy Back basis and Supply Installation and Commissioning of new 500 KVA online UPS and all its Accessories along with load synchronisation of both UPS at MANMUL Proposed UHT plant Gejjalagere -01 Job (2) Supply Installation Testing and Commissioning of 2000 Kgs Capacity Mechanical Motorized type Rope Lift at MANMUL-02 Nos (3) Supply, Installation, Erection, Commissioning of Forced Air Ventilation System for Filling Room at MANMUL-01 job (4) Shifting and ReInstallation of 350 CFM Capacity Atlas Copco Oil Free Air Compressor, Air receiver From UHT Plant Kumbalagodu to MANMUL and including Supply and Installation of SS 304 pipe & Accessories - 01 Job (5) Shifting and ReInstallation of Existing 02 Nos 60KL Vertical Milk Silo & 01 No 10KL Horizontal Milk Silo & its accessories-01 Job.
|